Select Page

As part of report prepared by Rowe Engineering analyzing whether the Flint River could be a permanent water supply for the City of Flint, LAN expressly addresses the need to provide for full softening and corrosion control treatments and estimates the total project costs to provide necessary upgrades to the Flint Water Treatment Plant (FWTP) to be $49,888,000.[ 6-2011 Appendix 8 ] No immediate decision was made.