Select Page

At a meeting with representatives of the City of Flint, the City tells LAN that it wants to complete the design and construction on the updated FWTP by July 2014 so that the Flint River can be used as a temporary water source until the KWA pipeline goes on-line in 2016, saving the City over $10,000,000. [ Meeting Minutes]