Select Page

The City approves LAN’s revised scope of work, limiting LAN’s scope to only six design tasks (including design work related to the FWTP ozone system, electrical system, mid-point chlorination system, service pump station, raw water piping connection and softening residuals disposal system) and does not give LAN any responsibility for water treatment or water quality issues. [CO #2 ]